Preloader

ECO Experts

Engineering Change Orders (ECOs) Made Easy

Streamlined FAA-Approved ECO Services from ASU

At Aviation Specialties Unlimited (ASU), we’ve completed thousands of Engineering Change Orders (ECOs) for customers worldwide. Whether you’re updating cockpit lighting or relocating equipment, we make the process fast, simple, and FAA-compliant. Most ECOs are completed in one to three weeks, depending on the complexity of your request.

What is an ECO?

An Engineering Change Order (ECO) is a formal process used to make minor but essential modifications to your aircraft. ASU’s experienced team ensures every detail is handled with precision and speed, so you can get back in the air with minimal downtime.

Common ECO Modifications Include:

  • Equipment relocation

  • Installation of previously approved equipment

  • Wiring or electrical changes

  • NVIS lighting system upgrades

  • Updated equipment depictions in aircraft drawings

How to Get Started

To begin your ECO, complete our ECO Request Form below and email it along with:

  • Aircraft photos

  • Marked-up ICA appendices

Send materials to eco@asu-nvg.com, and we’ll respond with a quote—usually within 1 business day.

Our ECO Process

We work closely with you to confirm the requested changes before updating your drawings. After your approval:

  1. We handle all documentation.

  2. Submit to the FAA for approval.

  3. Deliver final drawings and the approved ECO for your records.

Whether it’s your first ECO with ASU or your fiftieth, we make compliance simple.

Questions?

Reach out to our team at eco@asu-nvg.com or get started now by filling out the ECO Request Form below.

Engineering Change Order Request

Contact Information:

Billing Information:

If billing information is different, please share the correct billing information.

The following are required:

1. High quality photographs of the areas to be modified. Please include photos of the instrument panel, overhead, and center console.

2. A marked up copy of the aircraft specific ICA Appendices. Write legibly on the drawings with red pen and provide locations, model numbers, and other pertinent information.

File Upload:

Add the accepted file types pdf, jpg, jpeg, png
Accepted file types: pdf, jpg, jpeg, png, Max. file size: 180 MB.

ECO Process

Following this process ensures your ECO request is processed in the most timely and accurate manner.

Fill out the ECO request form above. Drag and drop these into the form:

You’ll receive a quote back within 1 business day, often within an hour:

Drawing update process begins with your signed quote approval:

When you’re happy with the drawings we’ll submit for DER/FAA approval and wrap up the project:

Add Your Heading Text Here